Testimonials and project summaries from mining farms that used Workspace Ashpath for rack assessments and hardware reviews.
Testimonials
Ashpath traced our 240 V runs in under an hour because they had already mapped the vertical trays during the assessment. The only gripe: they wanted us to relabel two rows we thought were fine — turned out they were right about the heat pocket behind PDU four.
We brought them in after a breaker trip took half a row offline. Their layout revision cut our mean time to isolate a bad cable from forty minutes to about twelve. Pricing was straightforward for the travel from Cheongju.
The single-unit review saved us from ordering thirty miners whose power leads were six centimetres too short for our tray height. Ashpath's bench photos made the case to our procurement team immediately. Report took four days, which was fine, though I would have liked a same-week turnaround.
Remote consultation was enough to catch that our network patch panel was mounted on the hot-aisle side. We fixed it before the on-site visit and saved a day of remediation time. The video session felt a bit rushed at exactly sixty minutes.
Project Summary: Osong Expansion
A fourteen-rack farm in Osong planned to add six rows of 0.08 TH/s ASIC units. During the cable-managed rack assessment, we found that existing vertical trays were mounted 4 cm too close to the PDU bank, forcing sharp bends on new stock cables.
Actions taken: Repositioned three tray sections, extended two PDU feeds, implemented a colour-coded label scheme across all rows.
Outcome: Post-remediation thermal imaging showed a 3°C drop at cable exit points. The farm completed expansion without a second shutdown for cable work.
Project Summary: Daejeon Immersion Pilot
A six-tank immersion pilot in Daejeon experienced intermittent hash rate drops traced to network patch strain. The full cable audit mapped cooling line crossings that had pushed patch cables against sharp tray edges.
Actions taken: Rerouted network runs to a dedicated horizontal tray above the tanks, separated from coolant return lines.
Outcome: Hash rate stability returned to baseline within 48 hours of remediation. The farm scheduled a phased audit for their planned forty-rack build-out.